INFRACERT d.o.o. issued two new certificates for the project "Improvement of infrastructure in the port of Rijeka - container terminal Zagreb pier" (POR2CORE-ZCT)

We are proud to announce that the company Infracert d.o.o. in the 12th month of 2022, together with the company Infracert TSI Sp. z o.o., issued an EC certificate on the verification of the electric power subsystem according to the technical specifications of interoperability, and for the first time in the Republic of Croatia, a certificate on the EC inspection of the type 25R160 contact network.

Both certificates have been issued for the project Upgrade of the Rijeka Port infrastructure – Zagreb Pier container terminal “POR2CORE-ZCT”.