REFERENCES

DEBO – STRUCTURAL SUBSYSTEMS (CCS/ENE)

 • OUTCOME OF THE DECLARATION OF CONFORMITY OF STRUCTURAL SUBSYSTEMS ACCORDING TO THE NATIONAL TECHNICAL RULES (DEBO) FOR THE PROJECT "RECONSTRUCTION OF THE EXISTING AND CONSTRUCTION OF THE SECOND RAILWAY TRACK ON THE DUGO SELO - KRIŽEVCI SECTION"

  • OUTCOME OF THE DECLARATION OF CONFORMITY OF ENE/PUSS STRUCTURAL SUBSYSTEMS ACCORDING TO THE NATIONAL TECHNICAL RULES (DEBO) FOR THE PROJECT "RECONSTRUCTION OF THE EXISTING AND CONSTRUCTION OF THE SECOND RAILWAY TRACK ON THE DUGO SELO - KRIŽEVCI SECTION"
  • OUTCOME OF THE DECLARATION OF CONFORMITY FOR THE PUSS STRUCTURAL SUBSYSTEM FOR THE PROJECT "Reconstruction of the existing track and construction of a second track on the section Križevci-Koprivnica-state border" 
  • OUTCOME OF THE DECLARATION OF CONFORMITY FOR THE ENE STRUCTURAL SUBSYSTEM FOR THE PROJECT "Reconstruction of the existing track and construction of a second track on the section Križevci-Koprivnica-state border"
DEBO- STRUCTURAL SUBSYSTEM ( INF )
  • OUTCOME OF THE DECLARATION OF CONFORMITY OF STRUCTURAL SUBSYSTEMS ACCORDING TO THE NATIONAL TECHNICAL RULES (DEBO) FOR THE PROJECT "RECONSTRUCTION OF THE EXISTING AND CONSTRUCTION OF THE SECOND RAILWAY TRACK ON THE DUGO SELO - KRIŽEVCI SECTION"

DEBO – VEHICLE SUBSYSTEM

 • ISSUING THE CERTIFICATE OF CONFORMITY OF LOCOMOTIVE TYPE Škoda 47E (class 230) FOR THE COMPANY ŠKODA PARS a.s.
 • Assessment of national requirements regarding the assessment and certification of L-4433 (Flirt3 DMU SLO) and L-4431 (Flirt3 EMU SLO) following the issuance of the ETCS correction (ERROR correction) for Stadler Praha

Assessment of national requirements regarding the assessment and certification of single sleeper compactor - ultimate 08-4×4/4s for PLASSER & THEURER

• Compliance with NNTRs in Croatia for the modification of 2 types of UIC wagons for the company Italcertifer s.p.a.

• Assessment of national requirements regarding the evaluation and certification of door changes on 5 different passenger cars (Apm 61 EC RIC type 31-116-0001-5-001-001

Apm 61 EC RIC with alarm system type 31-116-0003-1-001-001, Bpm 61 EC RIC type 31-116-0004-9-001-001, Ap, 61 Pano EC RIC type 31-116-0002- 3-001-001 ) for the company Certifer Deutschland GmbH

• Conformity check service according to national regulations in the capacity of DeBo railway vehicles as part of the Hermes project for the company ALTPRO d.o.o.

 

 

 

NOBO - STRUCTURAL SUBSYSTEMS

• OUTCOME OF THE DECLARATION OF CONFORMITY OF STRUCTURAL SUBSYSTEMS ACCORDING TO THE TECHNICAL SPECIFICATIONS OF INTEROPERABILITY (NOBO) FOR THE PROJECT "RECONSTRUCTION OF THE EXISTING AND CONSTRUCTION OF THE SECOND RAILWAY TRACK ON THE DUGO SELO - KRIŽEVCI SECTION"

• PROCUREMENT OF CERTIFICATES OF CONFORMITY OF STRUCTURAL SUBSYSTEMS NOBO ISV ENE/PUSS/INF/PRM ACCORDING TO NATIONAL RULES ON THE PROJECT DOCUMENTATION CREATED (CONCEPTUAL AND MAIN PROJECT) FOR THE MODERNIZATION OF THE RAILWAY ON THE ZAGREB MAIN STATION-CROATIA LESKOVAC SECTION FOR THE COMPANY ŽPD d.d.

• ISSUING THE CERTIFICATE OF CONFORMITY OF THE STRUCTURAL SUBSYSTEMS NOBO ISV SRT/INF/PRM/CCS ACCORDING TO THE NATIONAL RULES FOR THE PROJECT DOCUMENTATION CREATED FOR THE MODERNIZATION OF THE KNIN-ZADAR RAILWAY FOR THE COMPANY ŽPD d.d.

NOBO – PODSUSTAV VOZILA

• Conformity check service according to national regulations in the capacity of NoBo railway vehicles as part of the Hermes project for the company ALTPRO d.o.o.

 

DEBO - VEHICLE SUBSYSTEM (LOCOMOTIVE)

  • Certificate of conformity no. 27-08 / 2019 with national technical rules for multi-system electric locomotive, type Vectron unique code ELL 193 755
  • Certificate of conformity no. 17-09 / 2019 with national technical rules for multi-system electric locomotive, type Vectron, unique code ELL 193 761
  • Certificate of conformity no. 18-10 / 2019 with national technical rules for multi-system electric locomotive, type Vectron, unique designation ELL 193 399
  • Certificate of conformity no. 18-12 / 2019 with national technical rules for multi-system electric locomotive, type Vectron, unique designation ELL 193 561
  • Certificate of conformity no. 19-12 / 2019 with national technical rules for multi-system electric locomotive, type Vectron, unique designation ELL 193 562
  • Certificate of conformity no. 20-12 / 2019 with national technical rules for multi-system electric locomotive, type Vectron, unique designation ELL 193 563
  • Certificate of conformity no. 18-03 / 2020 with national technical rules for dual system electric locomotive, type TRAXX F160 AC3, unique code 91 80 6187 305-8
  • Certificate of conformity no. 09-06 / 2020 with national technical rules for diesel hydraulic locomotive, type VOSSLOH G6, unique code 98 80 0650 104-9
  • Certificate of Conformity no. 24-08 / 2020 with national technical rules for freight wagons, Uaai series, type TSW 310-20A, unique code 83 81 9960 203-1
  • Certificate of conformity no. 15-10/2020 with national technical rules for dual system electric locomotive, type TRAXX F160 AC3, unique code 91 80 6187 304-1
  • Certificate of Conformity no. 15-12/2020 with national technical rules for radiocommunication device unique code TRS6000
  • Certificate of Conformity no. 21-12/2020 with national technical rules for radiocommunication device unique code MESA 26
  • Certificate of Conformity no. 23-12/2020 with national technical rules for radiocommunication device unique code MESA 23
  • Certificate of Conformity no. 29-01/2021 with national technical rules for multimodal UHF receiver with transmitter, base radio stations for communication with train radio systems, unique code FESA 2010
  • Certificate of conformity no. 02-02/2021 with national rules for dual system electric locomotive, type TRAXX F140 AC2, unique code 91 80 6185 691-3
  • Certificates of conformity (no. 26-07/2021, 17-08/2021, 19-08/2021, 30-08/2021, 04-02/2022, 07-02/2022, 22-03/2022, 24-03/2022) with national rules for dual system electric locomotive, type TRAXX F140 AC2, unique codes 91 80 6185 673-1, 91 80 6185 681-4, 91 80 6185 684-8, 91 80 6185 676-4, 91 80 6185 716-8, 91 80 6185 717-6, 91 80 6185 690-5, 91 80 6185 680-6, 91 80 6185 677-2
  • Certificate of conformity no. 28-09/2021 with national rules for radiocommunication device unique code VS67
  • Certificate of conformity no. 14-04/2022 with national rules of the four-unite diesel motor train, type L-4433-FLIRT3 DMU, unique codes of wagons: Motor wagon A (MA)-95 79 5 610 015-1, power wagon (Power Pack) (E)-95 79 5 610 016-9, passenger wagon (C)-95 79 5 615 015-6, motor wagon B (MB)-95 79 5 615 016-4
  • Certificate of conformity no. 29-07/2022 with national rules of the four-unite electric motor train, type L-4431-FLIRT3 EMU, unique codes of wagons: Motor wagon A (MA)-94 79 6 510, passenger wagon D-94 79 6 515 039-6, passenger wagon C-94 79 6 515 040-4, motor wagon B (MB)-94 79 6 510 040-9
  • Issuance of a certificate of conformity with the national rules of the railway vehicle type APV 220 for the company Dalekovod d.d.
  • Issuance of a certificate of conformity with the national rules of the railway vehicle for special purposes - measuring vehicle for contact network series 812 for the company ATM BG d.o.o.
  • Issuance of a certificate of conformity with national rules of the TRAXX 188 MS3 series multi-system electric locomotive for the company BLUE Railway d.o.o.
  • Issuance of a certificate of conformity with the national rules of the locomotive CLASS 742 for the company ČD Cargo Adria a.s.
  • Issuance of a certificate of conformity with the national rules of the diesel-hydraulic motor train series 7122 for the company TSŽV d.o.o.
  • Issuance of a certificate of conformity with national rules of a multi-system electric locomotive AC 15/25 kV with diesel engine type EURODUAL for the company BLUE RAILWAY d.o.o.
  • Issuance of a certificate of compliance with national rules of the multi-system locomotive Vektron for the company ENNA TRANSPORT d.o.o.
  • Issuance of a certificate of compliance with national rules of the diesel hydraulic locomotive, type DHL 600-02, for the company CENOZA d.o.o.
  • Issuance of a certificate of compliance with national rules of the multi-system locomotive type TRAXX MS3 CC01C VR01.5 for the company BLUE RAILWAY d.o.o.
  • Issuance of a certificate of compliance with the national rules of the digital radio dispatch system FUNKWERK DUIC (RD central)
  • Issuance of a temporary certificate of conformity with the national rules of the diesel-electric locomotive type 466.2 for the company ČD Cargo
  • ISSUANCE OF THE CERTIFICATE OF CONFORMITY FOR THE FRAMAFER SUB-BREAKER for the company CENOZA PROMET d.o.o.
  • ISSUANCE OF THE CERTIFICATE OF CONFORMITY WITH THE NATIONAL RULES OF THE DIESEL-HYDRAULIC MOTOR TRAIN DMV SERIES 7122 for the company TSŽV
  • ISSUING THE CERTIFICATE OF CONFORMITY WITH THE NATIONAL RULES OF THE DIESEL-HYDRAULIC LOCOMOTIVE VOSSLOH for the company ENNA TRANSPORT
 

DEBO - VEHICLE SUBSYSTEM (WAGONS)

  • Issuance of the certificate of conformity of the railway wagon with 20 axles for the transportation of heavy loads from the Uaai series, unique numerical designation 83 81 996 0 203-1 in 9/2020 
  • Issuance of a certificate of conformity with the national rules of the high-floor control end wagon type Bfmpz in 11/2024
  • Issuance of the certificate of conformity with the national rules of the multi-purpose low-floor medium wagon type Bbmpvz in 11/2024
  • Issuance of a certificate of conformity with the national rules of low-floor medium wagons type Bmpz in 11/2024
  • Issuance of certificate of compliance with national rules low-floor restaurant medium wagon type BRmpz in 11/2024
  • Issuance of the certificate of conformity with the national rules of the low-floor medium wagon type Ampz 1 in 11/2024
  • Issuance of a certificate of conformity with the national rules of the high-floor end wagon type Ampz 2 in 11/2024

DEBO – STRUCTURAL SUBSYSTEMS ( CCS/ENE )

  • Certificate of Conformity no. 17-09 / 2020 with the national technical rules of the level crossing Dolac on km 17 + 178 and PP Hušnjakovo on km 17 + 084 of the railway R106 Zabok-Krapina-Đurmanec-DG
  • Certificate of conformity of ENE and CCS structural subsystems according to the national technical rules (DeBo) for the project “Port of Rijeka multimodal platform development and interconnection to Adriatic Gate container terminal” (POR2CORE-AGCT") for investors LUR and HŽI
  • Certificate of conformity for the ENE structural subsystem according to the national rules for the project “Upgrade of the Rijeka Port infrastructure – Zagreb Pier container terminal" (POR2CORE-ZCT), issued by Designated body (DeBo)
  • Certificate of conformity for the ENE structural subsystem according to the national rules for the project “Modernization and electrification of the Zaprešić – Zabok railway line" issued by Designated body (DeBo)
DEBO- STRUCTURAL SUBSYSTEM ( INF )
  • Declaration of conformity of the construction subsystem according to the national rules for the pedestrian crossing over the railway line L204 Banova Jaruga-Pčelić at km 54+490
  • Declaration of conformity of the construction subsystem according to the national rules for the PP Most pedestrian crossing at km 477+837 on the M202 line

NOBO - STRUCTURAL SUBSYSTEMS

  • EC certificates on the verification of the EEP, PUSS and INF subsystems according to the technical specifications of interoperability (NoBo) for the project "Development of a multimodal platform in the Port of Rijeka and connection to the Jadranska vrata container terminal (POR2CORE-AGCT") as collaborators of INFRACERT TSI
  • EC certificate on the verification of the infrastructure subsystem according to the technical specifications of interoperability for the project "Improvement of the infrastructure in the port of Rijeka - container terminal Zagrebačko pristanište" (POR2CORE-ZCT), issued by the notified body (NoBo) as collaborators of INFRACERT TSI
  • EC certificates on the verification of the electric power (EE) subsystem according to the technical specifications of interoperability (NoBo) for the project "Upgrading the Rijeka port infrastructure - container terminal Zagreb Gat (POR2CORE-ZCT)" as collaborators of INFRACERT TSI
  • EZ certifikat o provjeri elektroenergetskog (EE) podsustava prema tehničkim specifikacijama interoperabilnosti ( NoBo) za projekt “„Modernizacija i elektrifikacija željezničke pruge Zaprešić – Zabok” kao suradnici INFRACERT TSI1